|
| ||||||||
![]() | ![]() | ![]() | ![]() | |||||
| Ecotist buildings Photos of internal cladding & fit out (2)
Work continues with more internals, plus windows arriving to be fitted in the walls. Timber cladding starts and brick laying continues, matching the neighbour's brick detailing.
Perfect brickwork, accurate with a spirit level (bowing is from camera lens).
The large item is the rear door which took many men to move!
Windows from outside and in, and insulation.
|