Photos of foundations and drainage

This is Stage One of building work, involving services connections to site, digging for concrete footings, laying of footings. This gives the 2.5 metre concrete foundation. Electricity and water services are connected into the foundations. Blockwork is then built on top of this which is eventually filled with concrete to provide the level ground floor base.

Engineers: John Foster & Partners.
Builders: Abraday Properties Ltd.

cement mixer

Water services at Ecotist wooden frame building stage

laying concrete footings

digger

pile of London earth

laying concrete footings

arrival of drainage unit

laying drainage

blockwork

ground floor block base

ground floor filled concrete base