| Ecotist buildings Drawings of building stages
These drawings of the stages only apply to this particular job.
Stage 1 - Original site with bushes and garage. Existing house to right of site.
Stage 1 - Site is cleared. Original concrete bases on site are shown. These were also removed.
Stage 1 - Foundations and drainage, ground floor. For clarity, this drawing does not show the ground floor which sits on top of the foundations, and is the base for the timber structure. Water and electricity services are connected to the site.
Stage 2 - Timber structure (Benfield) and windows (Marvin Architectural).
Stage 3 - External works, basic service connections to building. Cladding, roof, landscaping, etc.
Stage 3 - Internal fit out of house 1A. Electrical, plumbing, kitchens, bathrooms, joinery, decoration etc.
Stage 3 - Internal fit out of house 1B. Electrical, plumbing, kitchens, bathrooms, joinery, decoration etc.
|