Drawings of building stages

These drawings of the stages only apply to this particular job.

Uncleared site

Stage 1 - Original site with bushes and garage. Existing house to right of site.

Cleared site

Stage 1 - Site is cleared. Original concrete bases on site are shown. These were also removed.

Foundations and drainage

Stage 1 - Foundations and drainage, ground floor. For clarity, this drawing does not show the ground floor which sits on top of the foundations, and is the base for the timber structure. Water and electricity services are connected to the site.

Timber structure and windows

Stage 2 - Timber structure (Benfield) and windows (Marvin Architectural).

External cladding

Stage 3 - External works, basic service connections to building. Cladding, roof, landscaping, etc.

Fit out 1A

Stage 3 - Internal fit out of house 1A. Electrical, plumbing, kitchens, bathrooms, joinery, decoration etc.

Fit out 1B

Stage 3 - Internal fit out of house 1B. Electrical, plumbing, kitchens, bathrooms, joinery, decoration etc.